Location
Philadelphia International Airport
Project Facts
Subcontracted by Philips Brothers electrical contractors to investigate control system deficiencies as left by another entity. Results showed several improperly programmed control devices and protection relays as well as the HMI supplied were failing.
Total Project $
$37,000
Client
Department of Aviation
Delivery Method
Design-Build
Project Description
Devices were reprogrammed, the HMI was replaced with enhanced programming added, and the PLC logic was majorly reconstructed. Standby generators were required to be online in under 10 seconds per NFPA 110 federal regulations after a power failure. As a result of our work, the generators were on line in 9 seconds. It was the first time the client’s system actually performed the way it was originally intended.